image of New Home Construction: 920 Oakleigh Beach, Dundalk, MD, 21222

New Home Construction: 920 Oakleigh Beach, Dundalk, MD, 21222

920 Oakleigh Beach Road of Dundalk MD is perfect for a homeowner to “live on vacation”. This waterfront lot will soon have a newly constructed detached home built by ClearWater Properties. This modern farmhouse style home checks all the boxes to enjoy life, work, and family/friends at home.

No doubt we are all celebrating the final phases of the COVID restrictions. But life changed a little while under lock down. We use FaceTime vs. calling friends and family we did not get to see as much. We have set up home offices to telework from and have mastered all the video meeting platforms. We are entertaining at home more often over getting together at restaurants and bars.

With record low interest rates so many people can buy their first homes and/or upgrading to better ones. Most buyers are spending the money to live more comfortably at home. It is now important to have the extra space to set up in-home offices. Large open floor plans are high on the demand list so people can entertain family and friends. Buyers are looking to “live on vacation”.

 

Floor Plans for New Home Construction in Dundalk, MD

 

920 Oakleigh Beach Road of Dundalk MD is perfect for a homeowner to “live on vacation”. This waterfront lot will soon have a newly constructed detached home built by ClearWater Properties. This modern farmhouse style home checks all the boxes to enjoy life, work, and family/friends at home. The main level is wide open with the living room, dining room, and gourmet kitchen overlooking the water view. Also on this level is a powder room and private office/den. Upstairs is 4 bedrooms, 3 full baths, and a laundry room. The owner’s suite is large with a walk-in closet a private bath with 2 vanities, a shower, and a separate soaking tub. These another bedroom with its own private path, as well as two more bedrooms and a full bath to share. The basement has a walkout entrance and a rough-in for a full bath. The buyer can also select to have the builder finish the basement.

The foundation has been poured and the floor trusses should be in by mid-July. The builder is estimating a 90-day completion from when the trusses come in, so mid to end of September. See the builder review the site plans at the link below:

 

920 Oakleigh Beach Site Plans Explained

 

Looking for a few examples of ClearWater Properties work? Below are a few examples:

 

 

0
Feed

Leave a comment